Datasets
Buyer room
POWERLANDMAP.COMManage supplier listing
PowerlandMap (Powerland Map) — Verified global data centre supply register with a source and verification date carried on every record: 6,015 publicly verified, non-demo sites across 154 countries totalling 92,005 MW of sourced IT capacity, each record carrying operator, stage (operational, under construction, planned, announced), capacity basis with the distinction between maximum total site IT MW and installed or available capacity, campus footprint in square metres, average PUE, delivery timing, plus mapped power context (generation GW across live, construction and development records, and…
supplier index read from their site
Verified global data centre supply register with a source and verification date carried on every record: 6,015 publicly verified, non-demo sites across 154 countries totalling 92,005 MW of sourced IT capacity, each record carrying operator, stage (operational, under construction, planned, announced), capacity basis with the distinction between maximum total site IT MW and installed or available capacity, campus footprint in square metres, average PUE, delivery timing, plus mapped power context (generation GW across live, construction and development records, and nearby substations as network objects), electricity-cost benchmarks with CAPEX and OPEX tooling, and an anonymised buyer-demand layer in megawatts matched against supply
Scale 6From 1 yearsCoverage Information Technology · Real Estate
Sample, licence terms, pricing and eval results when Powerlandmap publishes them. Until then, discover alternatives today with a 7-day trial.
Start 7-day trial →What buyers ask about Powerlandmap, answered from this page.
PowerlandMap (Powerland Map) — Verified global data centre supply register with a source and verification date carried on every record: 6,015 publicly verified, non-demo sites across 154 countries totalling 92,005 MW of sourced IT capacity, each record carrying operator, stage (operational, under construction, planned, announced), capacity basis with the distinction between maximum total site IT MW and installed or available capacity, campus footprint in square metres, average PUE, delivery timing, plus mapped power context (generation GW across live, construction and development records, and…
Powerlandmap offers (Alternative, Geospatial, Reference, ESG) — 6,015 verified sites across 154 countries with 92,005 MW of sourced IT capacity, plus a generation layer in GW across live, construction and development records, mapped substation and network objects, electricity-cost benchmarks per market, and an anonymised demand layer - every record carrying at least one named dated source.
Data centre site and market screening for operators, investors and developers; grid-adjacency and substation-proximity qualification for siting; electricity cost and CAPEX/OPEX benchmarking across markets; capacity-pipeline tracking by country and stage for equipment and cooling suppliers; buy-side and sell-side diligence in data centre M&A; anonymised demand intelligence for landlords and brokers; power-infrastructure investment targeting using the generation and network layers; validation of announced-capacity claims against dated verified records
The data is with 1 years of history.
Coverage spans US, Europe; Data Processing & Outsourced Services, Real Estate Management & Development; alternative, geospatial, reference, ESG; equities.
Powerlandmap has not added their own details yet. Not yet on file: