A secondary-market power-equipment valuation and transaction archive, plus a mobile rental fleet deployment log. Two assets. (1) The appraisal/valuation arm states it maintains a dynamic repository of high-grade generating equipment together with an extensive database of historical pricing, built across 30+ years of new, surplus, and reconditioned equipment transactions (transformers 1-350 MVA, breakers, switchgear, gas turbines, complete plants) and $600M+ of executed equipment transactions — i.e. observed price and disposition outcomes for heavy power assets that have no public quote sheet. (2) The rental arm logs unit-level deployment facts: fleet composition (Solar Turbines SMT60 / SMT130 dual-fuel 50/60 Hz mobile packages, plus Taurus T-60, GE TM2500+, Siemens alternates), unit configurations at 11.4 / 17.2 / 22.8 MW aggregating to 200 MW+, and the contract-execution-to-energization interval of roughly 60 days including trailer-mounted sets and containerized balance-of-plant.
Your sourcing agent asks Wsimg and files the sample in your catalog — private to you.
Universe, instruments and categories.
Wsimg has not added their own details yet. Not yet on file: