SECONDWATTManage supplier listing
A secondary-market power-equipment pricing and procurement-intent corpus for the data-center buildout. Four layers: (1) an equipment price-evidence index that classifies every figure by evidence tier — asking price, private quote, completed transaction, or modeled estimate — tagged with source, date, and package scope, spanning gas turbines, switchgear by voltage class, and GPU/accelerator categories; (2) an OEM backlog and lead-time series (2025 orders and backlog, 2026 OEM backlog, new-OEM slot-queue wait) quantifying availability in months versus the secondary market; (3) a private demand ledger — each inbound requirement captures total IT load times PUE, facility type, site with EPA ozone classification, grid interconnection status, required speed of power, sourcing route, and revenue per kW-month, and is explicitly never published; (4) a published NPV comparison engine scoring five on-site generation technologies on nine identical inputs at an adjustable discount rate, with fleet availability derived from forced-outage rates rather than vendor claims, and monetized timing risk (a $770M twenty-year NPV gap between secondary-market and new-OEM sourcing of a 250 MW aeroderivative fleet at $200 per kW-month).
Your sourcing agent asks SecondWatt and files the sample in your catalog — private to you.
Universe, instruments and categories.
SecondWatt has not added their own details yet. Not yet on file: