Datasets
Buyer room
DATA.GPIC.GD.CNManage supplier listing
Guangzhou Yangcheng Tong Co., Ltd. (广州羊城通有限公司) — Modelled cross-section public-transport passenger flow for Guangzhou bus and metro — boardings and alightings per stop, per line, per direction in 10-minute intervals, derived from transit-card tap records and registered as a data-intellectual-property asset (application 粤2024112800446, registration SZ2024120014562.7). Stated fields: travel date, time segment, line number, line name, stop number, stop name, up/down direction, boardings, alightings.. Large municipal infrastructure operator: registered capital RMB 40 million, staff band 100-499 p…
Modelled cross-section public-transport passenger flow for Guangzhou bus and metro — boardings and alightings per stop, per line, per direction in 10-minute intervals, derived from transit-card tap records and registered as a data-intellectual-property asset (application 粤2024112800446, registration SZ2024120014562.7). Stated fields: travel date, time segment, line number, line name, stop number, stop name, up/down direction, boardings, alightings.
From 25 yearsCoverage IndustrialsAsset class Equities
Sample, licence terms, pricing and eval results when Gd publishes them. Until then, discover alternatives today with a 7-day trial.
Start 7-day trial →What buyers ask about Gd, answered from this page.
Guangzhou Yangcheng Tong Co., Ltd. (广州羊城通有限公司) — Modelled cross-section public-transport passenger flow for Guangzhou bus and metro — boardings and alightings per stop, per line, per direction in 10-minute intervals, derived from transit-card tap records and registered as a data-intellectual-property asset (application 粤2024112800446, registration SZ2024120014562.7). Stated fields: travel date, time segment, line number, line name, stop number, stop name, up/down direction, boardings, alightings.. Large municipal infrastructure operator: registered capital RMB 40 million, staff band 100-499 p…
Gd offers (Alternative, Geospatial, Reference) — Order of 10^6 aggregate rows per year (365 days x ~140 ten-minute segments x network lines x stops x 2 directions), built on a tap base of ~13-18M events per day.
Transit scheduling and headway optimisation, route and stop redesign, peak-flow and transfer modelling, transport-policy evaluation, emergency flow monitoring; commercially retail and franchise site selection by footfall catchment, real-estate accessibility scoring, out-of-home advertising reach measurement
The data is with 25 years of history.
Coverage spans China/HK; Passenger Ground Transportation; alternative, geospatial, reference; equities.
Gd has not added their own details yet. Not yet on file: