Data-centre final-mile delivery and chain-of-custody records: per-rack delivery events with timestamps from pickup through final placement, rack weight and equipment class (server racks 2,400-4,200 lb, plus UPS, generators, switchgear, cooling and electrical distribution), 15-rack truckload composition, push-path and unloading protocol outcomes, Red Zone security-inspection passage records, damage and exception flags, and audit-ready proof-of-delivery documentation tied to named construction campuses
Equities, fixed_income in US, UK, Other, China/HK. Related tickers EQIX, DLR, VRT, ANET, DELL, SMCI, ETN, PWR, CEG, VNCE.L.
Mixed — timestamped operational milestone records plus document scans and photographs (proof of delivery, checklists, chain-of-custody paperwork); no customer-facing data feed or API is described
Est. order of 500-1,000 rack-delivery records per year today (2-3 deliveries per day x 15 racks per truckload, partially documented), scaling toward roughly 20 deliveries per day within six months — i.e. up to ~100,000 racks per year at full run-rate, with every delivery carrying a documentation set
Labels generated free by the delivery process: per-campus delivery counts per day (a direct construction-pace signal), per-rack cycle duration (7-9 hours observed), equipment class and weight per rack, exception and damage flags against a completed checklist, Red Zone inspection pass outcomes, and crew/labour hours consumed per rack — a unit-economics label almost no other source has
AW2 Logistics / Ace World Wide (aw2logistics.com), Muskego, Wisconsin, USA — Data-centre final-mile delivery and chain-of-custody records: per-rack delivery events with timestamps from pickup through final placement, rack weight and equipment class (server racks 2,400-4,200 lb, plus UPS, generators, switchgear, cooling and electrical distribution), 15-rack truckload composition, push-path and unloading protocol outcomes, Red Zone security-inspection passage records, damage and exception flags, and audit-ready proof-of-delivery documentation tied to named construction campuses. Small operator …
Not yet on file: Sample · Data dictionary · Data frequency · Reporting lag · Point-in-time · License