Data-center interconnection queue and load-study dataset: site-level prospective MW requests, cluster assignment, regional transmission upgrade requirements, per-project local service plans, estimated in-service dates through 2033, queue-position and contract-execution status, and contribution-in-aid-of-construction / collateral terms — aggregated across a 36-site, 13,022.7 MW application pool
Equities in US. Related tickers AEP, PJM, NEE, D, CEG, VST, NRG, ETN.
Tabular — per-site MW, cluster, upgrade scope and in-service-date tables, delivered inside PDF letters and docket attachments
36 formal load studies totalling 13,022.7 MW (32 sites, 9,807.7 MW inside Central Ohio) for the 2025 cycle, each study producing a local service plan plus regional upgrade assessment and a load forecast through 2033 — so roughly 36 site records per cycle with multi-year forecast series each, growing as subsequent 45-day intake windows open
Free labels generated by the queue mechanic: New versus Grandfathered project status, queue position, cluster identifier, regional-upgrade-required flag, study duration actually taken versus the 45/60-day rule, LOA/ESA signed-versus-forfeited outcome, collateral-posted-versus-exempt, and cancellation events — a supervised pipeline from application to built capacity
AEP Ohio (Ohio Power Company) — Data-center interconnection queue and load-study dataset: site-level prospective MW requests, cluster assignment, regional transmission upgrade requirements, per-project local service plans, estimated in-service dates through 2033, queue-position and contract-execution status, and contribution-in-aid-of-construction / collateral terms — aggregated across a 36-site, 13,022.7 MW application pool. Large — roughly 1,600 staff and about 3.9B revenue utility holding a site-level view of over 13 GW of requested data-center load concentrated in one of the highest-growt…